Friday, 2 October 2015

Filming day 1

On our first day of filming we got all our filming gear from Will's house and all the props we needed such as the Bath, buckets for the water, tea towel to cover the plug hole and some red colouring. We then packed everything in the car and made our way to the Long stay car park in Chelmsford.

Me and Steve placed the bath in a suitable place and began filling up the water buckets with water from the river. Will and Ben were shopping for some more red colouring to add to the river water. Ben then came along and helped us out by falling in the river and collecting water.

Once the bath had been filled we kept the water in by putting a rag over the hole and putting a weight over the rag. Tracking shots were then used by Steve hanging out of the car with the Go pro.

The go pro was also used to film shots of me emerging from the bath tub.

Other scenes in our filming involved smashing a beer bottle, eating grass and pouring water over Ben while he was singing.


No comments:

Post a Comment